Cover StoryDevelopmentNews

Fed. Controller of Works Commends Progress on Lagos-Calabar Coaster Highway Project in Akwa Ibom

2 Mins read

By Victor Oton

The Federal Controller of Works in Akwa Ibom State, Engr. Vincent Okoduwa, has expressed satisfaction with the steady progress recorded on Section 3A of the Lagos-Calabar Coastal Highway project following an inspection tour of the ongoing construction works in the state.

Leading officials of the Federal Ministry of Works on the inspection, Engr. Okoduwa visited key sections of the project to assess the quality and pace of execution. He noted that the contractor has successfully completed approximately nine kilometres of the dual carriageway using Continuously Reinforced Concrete Pavement (CRCP), describing the achievement as a significant milestone.

He further disclosed that construction activities are currently focused on the installation of median crash barriers, the laying of five per cent cement-stabilized stone base, and reinforcement works on an additional five kilometres of the carriageway.

The inspection team also visited the dredging location at kilometre 34, a swampy section of the project requiring massive sand filling before road construction can continue.

Engr. Okoduwa described the level of mobilization at the site as impressive, noting that the dredger and its supporting equipment have already been installed and are being prepared for full operation.

According to him, the contractor is expected to commence sand-filling operations at the location next week, a development expected to accelerate the pace of work on the strategic highway.

Receiving the inspection team, the Project Manager of Hitech Construction Company Limited, Engr. Kamil, expressed appreciation to the President of the Federal Republic of Nigeria, President Bola Ahmed Tinubu, GCFR, for his bold leadership and vision in initiating the Lagos-Calabar Coastal Highway project.

He also commended the Minister of Works, Engr. Dave Umahi, CON, for his unwavering commitment to ensuring the successful execution of the project through effective supervision and support.

Engr. Kamil described the Lagos-Calabar Coastal Highway as a landmark national infrastructure that will transform transportation, stimulate economic growth, enhance regional integration, and create new opportunities for investment and development along Nigeria’s coastal corridor.

He assured the Federal Ministry of Works that Hitech Construction Company Limited remains fully committed to delivering the project in accordance with approved specifications, maintaining the highest standards of quality, and completing the work within the stipulated timeframe.

The Lagos-Calabar Coastal Highway is one of the Federal Government’s flagship infrastructure projects designed to connect Nigeria’s coastal states, improve interstate transportation, promote commerce and tourism, and unlock the vast economic potential of the nation’s coastal communities.

   

About author
Time Nigeria is a modern and general interest Magazine with its Headquarters in Abuja. The Magazine has a remarkable difference in editorial philosophy and goals, it adheres strictly to the ethics of Journalism by using the finest ethos of the profession to promote peace among citizens; identifying and harnessing the nation’s vast resources; celebrating achievements of government agencies, individuals, groups and corporate organizations and above all, repositioning Nigeria for the needed growth and development. Time Nigeria gives emphasis to places and issues that have not been given adequate attention by others. The Magazine is national in outlook and is currently being read and patronized both in print and on our vibrant and active online platform (www.timenigeria.com).
Articles
Related posts
Cover StoryNewsReligion

76 Stakeholders Advocate Stronger Interfaith Dialogue, Peace Education at Bauchi FoRB Town Hall

3 Mins read
Seventy-six stakeholders drawn from religious institutions, traditional authorities, academia, civil society, youth and women groups, and the media have called for intensified…
Cover StoryOpinion

Oriire Abduction: Still Awaiting the Good News

5 Mins read
  By Taiwo Adisa, PhD Last week, I raised several lingering questions about the kidnap saga at Ahoro Esinele in Oriire Local…
Cover StoryEducationNews

PLASU Faces Indefinite Shutdown as ASUU Issues Strike Ultimatum, Demands Immediate Implementation of 2025 FGN Agreement

2 Mins read
Academic activities at Plateau State University Academic Staff Union of Universities (ASUU) Branch may soon be paralysed as the union has warned…
Stay on the loop!

Subscribe to our latest news.

Leave a Reply

WP2Social Auto Publish Powered By : XYZScripts.com